Most rooftop solar needs two permits: a building permit for the array on the roof and an electrical permit for the wiring. MI Energy prepares the building permit package, so the plans examiner sees a complete set the first time. Your licensed solar or electrical contractor installs the system and buys the electrical permit.
What Pierce County asks for
Pierce County's residential rooftop solar bulletin calls for a building permit through the County and a separate electrical permit from the Department of Labor & Industries or Tacoma Public Utilities. The construction plans include:
A roof layout of the panels, drawn to scale, with the solar AC disconnect shown
The total dead load of panels, supports, mountings, raceways and accessories, showing no more than 4 pounds per square foot and no point loads over 50 pounds
Manufacturer specifications and listings for the panels, racking and attachments
Utility-interactive listing for inverters on grid-tied systems
Installation details showing a positive connection to the roof and protection from moisture
Roof layout rules
The bulletin also sets fire-access and mounting rules the layout has to meet:
A clear pathway at least 36 inches wide from roof edge to ridge
Ridge setbacks of at least 18 inches on both sides when the array covers 33% or less of the roof, and 36 inches when it covers more
Panels mounted no higher than 18 inches above the roofing
Panels may not cover plumbing vents without County review
A solar water heating system needs a plumbing permit too
Cities have their own versions of these rules. We match the package to the office reviewing your permit.
When the roof needs engineering
Pierce County requires engineering when the system's dead load exceeds 4 pounds per square foot, when a point load over 50 pounds is created, or when the ground snow load is 70 pounds per square foot or more. In those cases, a Washington-licensed professional engineer (PE) reviews the framing and stamps a structural letter. See Solar Structural Letters.
Incentives that affect solar
Washington exempts state and local sales tax on solar equipment and installation for systems up to 100 kW AC, for installations completed by Dec 31, 2029. Checked Nov 2026. See Solar Sales Tax Exemption.
PSE says its Schedule 150 net metering remains available until a new rate schedule is in place, and that it will give notice before closing it to new applicants. Checked Nov 2026.
What's in our solar package
Site plan and roof plan with array layout, pathways and setbacks
Attachment and racking details
Dead load and point load summary
Equipment specification sheets
Structural letter when required
Responses to plan review comments
Solar permit FAQ
Q: Do I need a permit for rooftop solar?
A: In unincorporated Pierce County, yes: a building permit and a separate electrical permit.
Q: Who buys the electrical permit?
A: The electrical contractor doing the work. L&I says that if you hire an electrical contractor, it must buy the permit for the work it does.
Q: I'm an installer. Can you prepare permit sets for my jobs?
A: Yes. Send the address, roof photos, equipment and your layout.
Q: Can you add a battery to the plan?
A: Yes. See Home Battery Permits.
Ready to permit a solar project? Send the address, roof photos and your equipment list through our Contact Us form, call (253) 321-1467 or email office@mielements.com.