A ground-source heat pump uses the steady temperature underground to heat and cool a building. The equipment indoors is familiar; the loop field outside is where the planning happens. MI Energy lays out the loop field, checks setbacks, and coordinates the permits and state notices. Licensed drillers and HVAC contractors build it, with large commercial mechanical systems designed with licensed mechanical engineering partners.
Vertical boreholes: state rules
In Washington, a vertical boring for a closed-loop ground source heat pump is regulated by the Department of Ecology.
• A notice of intent must be submitted to Ecology at least 72 hours before drilling starts. The property owner or the owner's agent is responsible for it.
• The fee is $40 for up to four borings per project, plus $10 for each additional boring.
• The borings must be built by a Washington-licensed well operator.
• A boring can't be located within 100 feet of a water supply well, with limited variances.
• Each hole holds one loop and is grouted with bentonite grout right after the loop goes in.
What we plan
• Loop field type and location (vertical or horizontal)
• Setbacks from wells, septic systems, property lines and buildings
• Coordination of the Ecology notice with your driller
• Mechanical room and equipment layout
• Permit documents for the building department
Federal credit for business systems
Geothermal heat pump property owned by a business may qualify for the federal Section 48 energy credit if construction begins before Jan 1, 2035: 30% for projects under 1 MW, or 6% base (30% with prevailing wage and apprenticeship requirements met) for larger ones. Checked Nov 2026. Talk with your tax professional.
Geothermal FAQ
Q: Do I need a water right for a closed-loop system?
A: Ecology's notice of intent isn't a water right; a closed-loop boring is used only for heat exchange.
Q: I have a well. Can I still do geothermal?
A: Usually, if the borings can be kept at least 100 feet from the well, or a variance applies. We check your site.