Smart controls, energy monitoring, and battery and EV load management work best when they're planned before the walls close. MI Homes plans where the wiring, panels and equipment go and how the systems talk to each other. Licensed electrical contractors install it.
Who installs what
Washington licenses electrical work by specialty. A limited energy (06) specialty covers low-voltage and power-limited circuits, such as telecommunications and HVAC control wiring. Line voltage wiring in homes is covered by the residential (02) or general (01) specialties.
We plan the system so your contractors know what goes where.
What we plan
• Panel and subpanel locations with room to grow
• Energy monitoring and load management for EV chargers and batteries
• Lighting controls
• Thermostat and ventilation controls
• Network and low-voltage pathways
Smart home FAQ
Q: Can I add smart controls after the house is built?
A: Many can be added later, but conduit, panel space and low-voltage pathways are much easier to plan before drywall.
Q: Do you install the system?
A: We plan it. Licensed electrical contractors install it.