MI Elements
Home
MI Energy
  • Solar Structural Letter
  • Battery Storage Permits
  • EV Charger Permits
  • Solar Permit Packages
  • Commercial EV Charging
  • Clean Buildings Act
  • LED Lighting Retrofits
  • Net Metering Help
  • Commercial Energy Storage
  • Geothermal Heat Pumps
  • Heat Pump Permits
  • Generator Permits
  • Off-Grid Microgrids
  • Hydrogen Fuel Cells
  • Energy Consulting
MI Homes
  • Sustainable Home Design
  • Energy Code Compliance
  • Building Envelope
  • Rainwater and Greywater
  • Whole-House Water
  • Home Solar and Wind
  • Hydroponic Grow Rooms
  • Smart Home Design
  • SIP and Modular Homes
  • Net Zero Homes
  • Passive House WA
  • Healthy Home Design
Grants & Incentives
  • Grants Incentives
  • PSE Rebates
  • Clean Bldg Incentives
  • Solar Sales Tax
  • EV Charging Grants
  • Tacoma Power Rebates
  • Federal Business Credits
Contact Us
MI Elements
Home
MI Energy
  • Solar Structural Letter
  • Battery Storage Permits
  • EV Charger Permits
  • Solar Permit Packages
  • Commercial EV Charging
  • Clean Buildings Act
  • LED Lighting Retrofits
  • Net Metering Help
  • Commercial Energy Storage
  • Geothermal Heat Pumps
  • Heat Pump Permits
  • Generator Permits
  • Off-Grid Microgrids
  • Hydrogen Fuel Cells
  • Energy Consulting
MI Homes
  • Sustainable Home Design
  • Energy Code Compliance
  • Building Envelope
  • Rainwater and Greywater
  • Whole-House Water
  • Home Solar and Wind
  • Hydroponic Grow Rooms
  • Smart Home Design
  • SIP and Modular Homes
  • Net Zero Homes
  • Passive House WA
  • Healthy Home Design
Grants & Incentives
  • Grants Incentives
  • PSE Rebates
  • Clean Bldg Incentives
  • Solar Sales Tax
  • EV Charging Grants
  • Tacoma Power Rebates
  • Federal Business Credits
Contact Us
More
  • Home
  • MI Energy
    • Solar Structural Letter
    • Battery Storage Permits
    • EV Charger Permits
    • Solar Permit Packages
    • Commercial EV Charging
    • Clean Buildings Act
    • LED Lighting Retrofits
    • Net Metering Help
    • Commercial Energy Storage
    • Geothermal Heat Pumps
    • Heat Pump Permits
    • Generator Permits
    • Off-Grid Microgrids
    • Hydrogen Fuel Cells
    • Energy Consulting
  • MI Homes
    • Sustainable Home Design
    • Energy Code Compliance
    • Building Envelope
    • Rainwater and Greywater
    • Whole-House Water
    • Home Solar and Wind
    • Hydroponic Grow Rooms
    • Smart Home Design
    • SIP and Modular Homes
    • Net Zero Homes
    • Passive House WA
    • Healthy Home Design
  • Grants & Incentives
    • Grants Incentives
    • PSE Rebates
    • Clean Bldg Incentives
    • Solar Sales Tax
    • EV Charging Grants
    • Tacoma Power Rebates
    • Federal Business Credits
  • Contact Us
  • Sign In
  • Create Account

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • MI Energy
    • Solar Structural Letter
    • Battery Storage Permits
    • EV Charger Permits
    • Solar Permit Packages
    • Commercial EV Charging
    • Clean Buildings Act
    • LED Lighting Retrofits
    • Net Metering Help
    • Commercial Energy Storage
    • Geothermal Heat Pumps
    • Heat Pump Permits
    • Generator Permits
    • Off-Grid Microgrids
    • Hydrogen Fuel Cells
    • Energy Consulting
  • MI Homes
    • Sustainable Home Design
    • Energy Code Compliance
    • Building Envelope
    • Rainwater and Greywater
    • Whole-House Water
    • Home Solar and Wind
    • Hydroponic Grow Rooms
    • Smart Home Design
    • SIP and Modular Homes
    • Net Zero Homes
    • Passive House WA
    • Healthy Home Design
  • Grants & Incentives
    • Grants Incentives
    • PSE Rebates
    • Clean Bldg Incentives
    • Solar Sales Tax
    • EV Charging Grants
    • Tacoma Power Rebates
    • Federal Business Credits
  • Contact Us

Account

  • My Account
  • Sign out

  • Sign In
  • My Account

Grants & Incentives

EV Charging Grants and Rebates

Programs change often. Amounts, deadlines and eligibility were checked in November 2026. Confirm with the program before you plan around them. Each program decides who qualifies, and nothing here is tax advice.

Incentives for EV charging in the Pierce and King County area come mostly from utilities, plus one federal program for highway fast charging run by WSDOT. Checked Nov 2026.

PSE Up & Go Electric for Workplace

What it pays: PSE-owned turnkey option: PSE covers 100% of installation and maintenance costs, up to $12,000 per Level 2 port, for up to 10 ports per property. Customer-owned option: 50% of equipment and installation costs, up to $2,000 per Level 2 port, for up to 10 ports per property. Qualifying workplaces that serve or employ named communities may get up to $4,000 per port under the customer-owned option (Empower Mobility).

Deadline: None posted.

Who's eligible: Commercial PSE electric account holders with dedicated EV parking (transmission-only customers excluded). Requirements include showing employee EV interest, operating the chargers for 10 years, surveying employees each year, and using PSE-qualified hardware or a separate meter.

Official source: https://www.pse.com/en/pages/electric-cars/Workplace-charging

Checked Nov 2026.

PSE Up & Go Electric for Fleet

What it pays: Up to $250,000 per charging location. PSE-owned: up to $12,000 per Level 2 port and $125,000 per DC fast charging port. Customer-owned: up to $4,000 per Level 2 port and $60,000 per DC fast charging port. Higher Empower Mobility amounts are listed for qualified customers.

Deadline: None posted.

Who's eligible: Current non-residential PSE electric customers (transmission-only Schedules 448/449 excluded) with at least two owned or leased EVs by the time the chargers are activated (one for qualified Empower Mobility customers). Requirements include operating the chargers for 10 years and installing networked equipment.

Official source: https://www.pse.com/en/pages/electric-cars/fleet-electrification

Checked Nov 2026.

PSE EV home charger rebate

What it pays: Up to $300; income-qualified customers up to $600, plus up to $2,000 toward installation.

Deadline: Apply within 60 days of installation.

Who's eligible: Properties in PSE's electric service area installing a PSE-prequalified ENERGY STAR smart Level 2 charger. One rebate per single-family residence within a 5-year window.

Official source: https://www.pse.com/en/rebates/ev-home-charger

Checked Nov 2026.

Tacoma Power EV charging bill credits

What it pays: $400 bill credits each for buying a Level 2 charger, buying a smart splitter, electrical work to install a charger or splitter, or installing a 240-volt EV outlet. $600 maximum for more than one. Credits can't exceed documented material and labor costs.

Deadline: Apply with proof of purchase and installation dated within the last 90 days.

Who's eligible: Current Tacoma Power residential customers; one incentive per account. Equipment must be purchased and installed before applying.

Official source: https://www.mytpu.org/ways-to-save/for-my-home/ev-charging/

Checked Nov 2026.

WSDOT NEVI Round 2 (federal)

What it pays: WSDOT intends to award up to $69 million in federal funding for DC fast charging along eligible corridors, for light-, medium- and heavy-duty charging sites.

Deadline: Proposals accepted any time through Oct 20, 2027. WSDOT reviews proposals monthly.

Who's eligible: Companies that will install, operate and maintain the chargers. Davis-Bacon and Washington prevailing wage rates and Buy America requirements apply.

Official source: https://wsdot.wa.gov/business-wsdot/grants/zero-emission-vehicle-grants/national-electric-vehicle-infrastructure-grant

Checked Nov 2026.

How MI Elements helps

Site layout, load and service sizing, conduit routing, pads and bollards, and permit documents, with engineering by a Washington-licensed professional engineer (PE) where required. Your licensed electrical contractor installs the equipment. Each program decides eligibility.

EV grants FAQ

Q: Can a small business use PSE's workplace program?

A: Any commercial PSE electric account holder with dedicated EV parking can apply, if it meets PSE's other requirements.

Q: We're not a charging company. Is NEVI for us?

A: NEVI funds companies that will install, operate and maintain fast chargers along eligible corridors.

Close-up of an orange EV charging connector plugged into a white electric car

Ready to take the next step?

Join us and discover what we can do for you.

Contact Us
  • About
  • FAQ
  • Terms
  • Privacy

MI Elements

16202 64th St E, Ste 117, Sumner, WA 98390

(253) 321-1467

Copyright © 2026 MI Elements - All Rights Reserved.

office@mielements.com

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept