Factory-built and panelized homes go up faster on site, but the permit and engineering pieces still have to come together. MI Homes handles the site work, foundation design, energy code and permits that connect a factory-built or panelized house to your lot.
Modular homes: who approves what
L&I approves factory-built (modular) homes: plans are approved, the units are inspected at the factory, and an L&I insignia is attached. L&I only reviews the foundation plan to make sure it suits the general house design. The local building department where the house is installed must approve the site-specific foundation and site plans, and the installation and use need local permits.
SIP and panelized homes
Structural insulated panel and panelized homes are built on site from manufactured panels, so they go through local permitting like other site-built homes. We coordinate the panel supplier's drawings with the permit set.
What we prepare
• Site plan and foundation design, with engineering by a Washington-licensed professional engineer (PE)
• Connections between the house and foundation
• Energy code credit documentation
• Permit set for the local building department
Modular and SIP FAQ
Q: If L&I approved my modular home, do I still need a local permit?
A: Yes. The local building department permits the foundation, installation and location.
Q: Are SIP homes good for the energy code?
A: They can help with insulation and air sealing. We document the assemblies for your energy code compliance.